Description
This article describes a dynamic implementation of the model of Autogenous (AG) and Semi-Autogenous (SAG) mills by Leung (1987), with the variable breakage rates extension of Mutambo (Morrell and Morrison, 1996).[1][2][3]
Model theory
This section is currently under construction. Please check back later for updates and revisions.
|
Excel
This section is currently under construction. Please check back later for updates and revisions.
|
SysCAD
This section is currently under construction. Please check back later for updates and revisions.
|
References
- ↑ Napier-Munn, T.J., Morrell, S., Morrison, R.D. and Kojovic, T., 1996. Mineral comminution circuits: their operation and optimisation. Julius Kruttschnitt Mineral Research Centre, Indooroopilly, QLD.
- ↑ Leung, K., Morrison, R.D. and Whiten, W.J., 1987. An Energy Based Ore Specific Model for Autogenous and Semi-autogenous Grinding, Copper 87, Vina del Mar, Vol. 2, pp 71 - 86
- ↑ Morrell, S. and Morrison, R.D., 1996. AG and SAG mill circuit selection and design by simulation. In International Conference on Autogenous and Semiautogenous Grinding Technology (Vol. 2, pp. 769-790).